Abstract:Combined with engineering projects, this paper analyzes the specific workflow of installation and debugging of class Ⅱ type B2 biosafety cabinet in BSL-3 laboratory. The announcements during the usage phase of biosafety cabinet are also summarized in this paper. Thus, management staff and operating staff of BSL-3 laboratory can understand the biosafety cabinet systematically and use the biosafety cabinet correctly.
蒋晋生. Ⅱ级B2型生物安全柜在BSL-3实验室中的安装及调试[J]. 中国医疗设备, 2014, 29(1): 119-121.
JIANG Jin-sheng. Installation and Debugging of Class Ⅱ Type B2 Biosafety Cabinet in BSL-3 Laboratory. China Medical Devices, 2014, 29(1): 119-121.